Curtiss-Wright Secures TerraPower Contracts for Natrium Nuclear Reactor Simulation and Control Systems

Curtiss-Wright Corp. said it has been awarded two contracts from TerraPower to design and supply plant simulation and digital control solutions for the Natrium advanced nuclear reactor design. Under the contracts, Curtiss-Wright will design and deliver the training simulator (TSN) and distributed control systems (DCS) for the Natrium plant. The TSN is a full-scope simulator that […]

The post Curtiss-Wright Secures TerraPower Contracts for Natrium Nuclear Reactor Simulation and Control Systems appeared first on POWER Magazine.

Natrium reactor system (345 MWe, scalable output)

Curtiss-Wright Corp. said it has been awarded two contracts from TerraPower to design and supply plant simulation and digital control solutions for the Natrium advanced nuclear reactor design. Under the contracts, Curtiss-Wright will design and deliver the training simulator (TSN) and distributed control systems (DCS) for the Natrium plant. The TSN is a full-scope simulator that…

Leave a Reply

Your email address will not be published. Required fields are marked *