Month: January 2025
Talen, PJM Reach Agreement to Keep 2 GW of Coal, Oil Generation Online for Reliability in Maryland
by .
Talen Energy has reached an agreement with PJM Interconnection, the Maryland Public Service Commission, Maryland electric utilities, consumer representatives, and the Sierra Club to extend operations at its 1.3-GW coal-fired Brandon Shores power plant and 774-MW oil-fired H.A. Wagner units until May 31, 2029, under a reliability-must-run (RMR) contract. If approved by the Federal Energy…
Read MoreU.S. Energy Independence—Let’s Recycle Our Nuclear Waste
by .
As an energy veteran with decades at the Department of Energy, I’ve witnessed the highs and lows of nuclear power in America. Now, with President Trump back in office, there’s an opportunity to not just revisit but truly revolutionize our approach to nuclear energy, particularly by closing the nuclear fuel cycle. This isn’t about starting…
Read MoreRecent Posts
- DOE Opens Door to Private-Sector Demonstrations at MARVEL Nuclear Microreactor Test Bed
- Three Strategies for Seamlessly Incorporating AI into the Modern Energy Equation
- Safe, Secure, Economically Viable Nuclear Fuel Recycling is Here
- Talen, Amazon Launch $18B Nuclear PPA—A Grid-Connected IPP Model for the Data Center Era
- Out of Sync: The Infrastructure Misalignment Undermining the U.S. Grid